Reconstruction works of water flow shutter and spillway at ķegums hydroelectric power plant
During the project UPRENT ensured repair area dewatering, that was located in Daugava river, to build additional temporary fence to…
Uprent poland team has performed an outstanding bypassing project
UPRENT performed full project development including: project site inspection, project design with 3D models presented to the client, whole pumping system installation,...
Read More
Pumping station installation
UPRENT installed wellpoint dewatering system and piston pump for groundwater level lovering to ensure safe and dry working conditions for…