Project description
Groundwater lowering in the construction of a private house in Vilnius, Bebru Street. Uprent carried out groundwater lowering services.
The service consisted of the following:
- project development,
- equipment transportation,
- equipment installation,
- equipment rental,
- project supervision,
- dismantling works.
Project duration: 4 months
The following were used in the project:
- BBA PT 150 main electric pump E,
- BBA PT 90 spare diesel pump.
This pump configuration was chosen to ensure continuous drainage of groundwater during excavation and concreting works. Thus, we managed to prevent even the slightest possibility of loss of electricity or groundwater entering the construction site, which could affect duration of construction and lead to higher construction costs.